Cableway to be built between Crimea and Krasnodar Territory

Read on the website Vestnik Kavkaza

The Trade and Industry Chamber of Crimea proposed construction of a cableway between Crimea and Krasnodar Territory over the Kerch Strait. The cableway will be 4.5km long 70m above the sea level. Its construction will take 1-2 years, RIA Novosti reports.


A bridge over the Kerch Strait will be built in 2021.