First section of Zangezur corridor put into operation (VIDEO)

First section of Zangezur corridor put into operation (VIDEO)

The section of the Horadiz-Agbend railway has already been commissioned, AzTV reports.

The length of the section, located in the Jebrail region, is 23 km. Freight trains are already running along it, carrying materials for the further construction of the railway line.

The length of the Horadiz-Agbend railway is 110 km. The entire construction territory was cleared of mines, an earthen embankment was built and bridges erected.

At the moment, trains run along the section of the railway starting from Horadiz in the direction of Zangilan. The construction of stations is underway.

5775 views
Поделиться:
Print: