Azeri Light oil, which is pumped through the Odessa-Brody pipeline, is currently located at Brody (Ukraine) and will arrive at the Mozyr Oil Refinery in April, Trend reports, citing the Belta agency and the acting director of the company, Sergei Sosnowski.
According to him, the exact date of arrival will be known after the sides work out and coordinate the delivery schedule.
He reported that during February and March 450,000 tons of technological oil were pumped out, which arrives at the Mozyr refinery. In order for the plant to start getting clean crude Azeri light oil about 600,000 tons of raw hydrocarbon materials should be removed from the pipeline.
The flow of Azerbaijani oil to the Mozyr refinery using the Odessa-Brody pipeline in the direct mode and the Mozyr-Brody part of the oil pipeline "Druzhba" in reverse mode started on February 13, 2011.