Armenian NPP after a stopping for the planned preventive maintenance in the morning was reconnected to a network of energy generation of the republic, News Armenia reports.
"The power plant at this time was stopped for not for safety improvement or refueling, but for annual planned engineering works. During the 16-day break repair and cleaning of two nuclear power turbine generators were carried out ", says the statement.