The State Oil Company of the Azerbaijan Republic (SOCAR) plans construction of the new N620A platform at the Neft Dashlary platform. Neftgaztikinti will be the contractor of the project.
8 oil wells will be drilled. The platform will be built at a depth of 27m. Two sectors of the platform will have two 33-m bridges connecting them. A tanker capable of carrying 42 people will be stations there to save them in case of an emergency. Three diesel generators will operate at the platform.